Does a remote port order include final tie-down?

When ordering a remote port (connect a virtual device on Network Edge to an NSP), will Equinix complete the final patch (tie-down) between ECX port and my NSPs patch panel port?
  • J_Shin's avatar
    J_Shin
    2 years ago

    Hi KS, 

    That is correct!  To add to what Marek indicated... an LOA is required and is submitted with the Equinix Remote Fabric Port order in our Equinix Portal.  Contained within the LOA (Letter of Authorization) is a section that can be referred to as the CFA (Channel Facility Assignment), which will have the requisite tiedown info on as you are referring to as the front panel... and yes, you are also correct that the NSP is responsible for any jumpers, patching, etc within their own cage/s.  Typically and usually the case, if any work is required within an NSP cage, the NSP can schedule their own dispatch to perform the work. 

    NSP Last Mile <> Equinix IBX Data Center (NSP Cage) - Patch Panel <> Equinix Physical Cross Connect <> Equinix Remote Fabric Port.