Forum Discussion

Jantzen's avatar
Jantzen
Equinix Employee
4 years ago
Solved

Upgrade from Standard Connection Package to Unlimited Connection Package

Do I need to order a new Fabric port in order to upgrade my existing Standard Connection Package to the Unlimited Connection Package or can my existing port be upgraded?

  • There is no need to order a new port if you are simply upgrading from standard to unlimited. Your existing port can be upgraded to the Unlimited Connection Package by submitting a move, add, change, delete (MACD) request.

    Here is some additional information:

    When should you order a new Fabric port vs. submitting a MACD?

    New Fabric port(s) are required in three cases:

    1. When you want to change the physical port speed from one speed to another. E.g., You have a 1Gbps physical connection and want to move to a 10Gbps physical connection.
    2. When you want to add a new port to an existing LAG (Link Aggregation Group).
    3. When you want to add ports to an existing LAG or create a new LAG altogether, but there is not enough physical capacity on your existing Fabric node, you will need to order all new ports. This includes ordering and replacing your existing port(s).

    MACDs: Customers wishing to upgrade or downgrade between the Standard Connection Package and the Unlimited Connection Package do not need to install new ports and can request the change without impact on their existing service via a MACD.

    For more information on the MACD process, refer to Upgrade an Equinix Fabric Port on the Equinix Fabric Documentation site.

1 Reply

  • Jantzen's avatar
    Jantzen
    Equinix Employee

    There is no need to order a new port if you are simply upgrading from standard to unlimited. Your existing port can be upgraded to the Unlimited Connection Package by submitting a move, add, change, delete (MACD) request.

    Here is some additional information:

    When should you order a new Fabric port vs. submitting a MACD?

    New Fabric port(s) are required in three cases:

    1. When you want to change the physical port speed from one speed to another. E.g., You have a 1Gbps physical connection and want to move to a 10Gbps physical connection.
    2. When you want to add a new port to an existing LAG (Link Aggregation Group).
    3. When you want to add ports to an existing LAG or create a new LAG altogether, but there is not enough physical capacity on your existing Fabric node, you will need to order all new ports. This includes ordering and replacing your existing port(s).

    MACDs: Customers wishing to upgrade or downgrade between the Standard Connection Package and the Unlimited Connection Package do not need to install new ports and can request the change without impact on their existing service via a MACD.

    For more information on the MACD process, refer to Upgrade an Equinix Fabric Port on the Equinix Fabric Documentation site.

Featured Places

  • Node avatar for Discussions

    Discussions

    Engage with industry experts, share insights, ask questions, and grow your network.
  • Node avatar for Ideas

    Ideas

    We're listening! Submit your ideas to shape the future of Equinix!
  • Node avatar for Groups

    Groups

    Ready to collaborate? Join a Group or upcoming beta program.
  • Node avatar for What's New

    What's New

    Stay ahead with the latest from Equinix. Discover new product announcements, insightful tutorials, and practical use cases.
  • Node avatar for Events

    Events

    Your Guide to Upcoming Events - Online, Hybrid, and In-Person!